Hooking up the electrical wires for, well, power:
Hooking up the drain pipe to the disposer to well, dispose:
Then plug in the power cable.
Then roll it into place.
And then submit energy efficient rebate, arrange an inspection for model verification, and then done!
Truthfully, the most difficult part was the inspection appointment...
No comments:
Post a Comment